Boston High School
Description: 32’x10′ (9.6m x 3.0m) Timber Clad Jackleg Cabin Completion Date: Spring 2024 Type: Thermowood Clad Cabin In April 2024 a brand new Timber clad cabin, measuring 32′ x 10′ (9.6m x 3m), was delivered and installed. It was lifted into position using a Hiab articulated vehicle (lorry with an on board crane) and placed onto …
Saferoad UK Limited
Description: 2 Bay Modular Training Room Completion Date: Summer 2024 Type: Plastisol 2Bay Modular The client contacted Excel Modular in the middle of July looking for a training room for their site south of the River Humber. Their requirement was to hire the building for 18 months with an option to purchase. A site visit …
Keele University
Description: Student Cabins for 3 different sites Completion Date: Summer 2024 Type: New Timber Clad Cabins for long term hire The client contacted Excel Modular in May after being let down by another modular building company and were desperate to have the buildings manufactured and installed for the beginning of July. The clients brief – …
Expanding our services to meet our clients needs
A new gatehouse for our clients, Crown Paints Description: 32′ x 10′ (9.6m x 3m) Jackleg Cabin Completion Date: April 2024 Client: Crown Paints Type: New Plastisol Cabin Gatehouse A site visit was conducted which allowed us to assess the clients requirements and understand any onsite constriants. Whilst on site they also asked us to …
Continue reading “Expanding our services to meet our clients needs”
Hull Sea Cadets
Description: 32′ x 10′ (9.6m x 3m) Jackleg Cabin Completion Date: Summer 2019 Type: New Plastisol Cabin A site visit was conducted to assess the organization’s requirements and the proposed location. Once the building size and layout were determined, the organization successfully raised the necessary funding. Excel’s design team submitted a successful planning application. In …
New Classroom Accommodation
Faced with a surge in pupil numbers, the school reached out to Excel to secure temporary classrooms until additional spaces could be constructed within the main building. After a site visit in March, it became apparent that a comprehensive turnkey project was necessary. This encompassed organizing planning permission, building control, groundworks, access, and electrical supply, …
Beeford Primary School
We were successful in our tender bid to supply a single modular classroom to the small village of Beeford in East Riding of Yorkshire. Description: 4 Bay Modular Classroom Project Timeframe: 6 weeks Main Contractor: J P Developers Client: East Riding of Yorkshire Council Factory manufactured and fitted out to the highest standards, the modular …
Refurbished Welfare Facility
Having supplied numerous buildings over the years to our client, we were delighted to assist them with a requirement to upgrade their existing cabin welfare facilities to a Refurbished Modular Building. Requirements/Brief: Male and Female Changing Rooms/showers/toilets, large canteen area, storage for equipment. Description: 5 Bay Modular Welfare Facility Start Date: 04/01/23 Completion Date: 10/02/23 Type: Refurbished Our …
The Society for Sailing Barge Research
For The Society for Sailing Barge Research, the acquisition of a new portable building for their archive storage was a big thing, the Society’s largest ever single expenditure in its sixty years existence. After lots of consideration, the archive store was ordered and preparation to clear the site was started. Description: 36′ x 12′ (10.8m …
Newington School Modular Classroom
Excel was successful in winning a tender to supply a New 8 Bay Modular Classroom Facility for Newington School in Hull Description: 8 Bay Classroom Start Date: 26th July 2021 Completion Date: 2nd September 2021 Type: New Working with the main contractor, R H Fullwood & Co Limited who was contracted to install a new MUGA …
CPS Lifts Office Accommodation
Our clients had recently moved into their new warehouse facility and required some office and canteen accommodation as there was no facilities on site. Not a straight forward delivery, the install was completed within the warehouse by our hauliers David Watson Transport, who did a great job. Description: Manufacture of 2no. 20′ x 10′ Plastisol …
Commscope Design & Intergration
Excel was contacted by our client as they were keen on a Two Storey Modular Building we had for sale from our pre-used stock list. However, the existing external finish of the building did not blend in with the existing surroundings – this was no problem, we removed the existing metro tile and replaced the …
New Temporary Visitors Centre for Humber Bridge
Excel was contacted by the Humber Bridge to Tender for the above project during March 2019. Description: 3 Bay Modular (Planning, Foundations, Modular Build Installation) Start Date: 25th July 2019 Completion: 30th July 2019 Type: Hire A modular building from our Hire Stock was refurbished to the clients Brief, along with the Planning approval and …
Continue reading “New Temporary Visitors Centre for Humber Bridge”
SEN Classroom for St Anne’s Community School
Excel was successful in winning a tender to supply a Refurbished portable classroom, which was required within 4 weeks of the order being confirmed Description: 48′ x 13′ Start Date: 1st August 2018 Completion Date: 28th August 2018 Type: Refurbished A Portable Cabin Pullman was completely refurbished for our client, which included new windows, …
Continue reading “SEN Classroom for St Anne’s Community School”
New Offices for White Water Rafting Centre
After successfully winning a tender to supply cedar clad cabins in 2017, the client had a requirement for a small modular office complex, to compliment the existing buildings and surroundings at the Olympic White Water Rafting/Canoe Centre. Description: 2 Bay Modular Office Start Date: May 2018 Completion Date: May 2018 Type: NEW A 2 Bay modular …
Continue reading “New Offices for White Water Rafting Centre”
New Toilet Facilities
New Toilet Facilities for Dobbs Weir Caravan Park in Lee Valley Description: Male & Female Toilet Block 8.4 x 3.6m Start Date: May 2018 Completion Date: May 2018 Type: NEW Cedral cladding to the exterior was required to fit in with the surrounding buildings, along with wrapped upvc double glazed windows.
Beal Homes – Marketing Suite
Having supplied Beal Homes with a number of site Set ups around the Humber Region we were delighted to be asked to provide a new Marketing Suite for the new development at Welton. Description: Marketing Suite 9.6m x 3.2m Start Date: 28/10/2017 Completion Date: 01/01/2018 Type: NEW After a number of designs forwarded to the …
Beal Homes – Fruit Market
A local builder in Hull, Beal Homes contacted the sales team for a refurbished site set up for the prestigious Fruit Market site in Hull. Description: Offices, Meeting Rooms, Canteen and Toilet Block Start Date: 15/09/2017 Completion Date: 17/09/2017 Type: Refurbished This is the third site we have supplied Beal Homes with there contractor accommodation, …
Skanska
Skanska purchased part of a large 72 Bay 3 storey modular building complex from Excel Modular in May 2015 and asked us to relocate the building to a new project site they where starting at Papworth Hospital, Cambridge 48 Modules where purchased in total in a “as is” condition and relocated to the new site, …
South Hunsley High School
Temporary modular accommodation from our Hire Fleet was used to provide our client with 6 classrooms for a period of 28 weeks whilst the school underwent building works during 2015/16. Apart from the building we also carried out the installation of the foundations and supplied the generator for the temporary electric supply. Customer: South Hunsley …
Nightel Ltd
More than just an airport hotel with over 40 years combined experience in the offshore industry we pride ourselves in providing dedicated accommodation and recreation facilities tailored to the needs of the business traveller. Nightel Humber hotel has 100 feature rich Single rooms along with a number of Double & Family Rooms. Client: Nightel Limited …
Cottingham Library
A Modular Building from our Hire Fleet was used to provide our client with a temporary library whilst the Civic Hall underwent major refurbishment. Scope of works: Services connections, foundations, Modular building and perimeter skirting and access steps/ramps. Customer: East Riding Council Location: Cottingham Date: December 2016
Trican Well Services
We were contacted by Trican Well Services after seeing our buildings sited at a Drilling Site in Preston, Lancashire. An ISO HC 40’ container was customised for our client to use as a Core Laboratory facility which they could then ship world wide depending on where the next project was. Not only did we carry …
J Murphy & Sons
Our long term client contacted our Mr Waller to relocate the existing offices sited in Rotherham to the new site in Leeds. Scope of works: Dismantle and relocate, external refurbishments and alterations. No. of Modules: 5 Modules Start Date: 01/01/2016 Completion Date: 01/02/2016 Value: £40k