Boston High School
Description: 32’x10′ (9.6m x 3.0m) Timber Clad Jackleg Cabin
Completion Date: Spring 2024
Type: Thermowood Clad Cabin
In April 2024 a brand new Timber clad cabin, measuring 32′ x 10′ (9.6m x 3m), was delivered and installed. It was lifted into position using a Hiab articulated vehicle (lorry with an on board crane) and placed onto concrete pavers. The building was located adjacent to the main brick building, the new cabin will provide additional teaching space for the school.
Client was responsible for groundworks and electric supply
Get in Touch